Project Description
This 30-story, 400-foot tower is located in the prestigious Upper Kirby/River Oaks neighborhood. It contains 30,000 square feet of entertainment, fitness, pool and spa facilities.
Scope of Services
CDC performed an investigation of the existing glass guardrails and podium cladding which determined the work was not code compliant based on the results of the investigation, CDC was retained as the engineer of record to replace the materials in question and provide design drawings for the replacement guardrails. CDC also provided litigation support.
CDC Client
SBI Consultants, Inc.
Original Architect
Ziegler Cooper Architects
Date of Original Completion
2010
Date of Project Completion
2013